Understand

Dependencies and lags

Represent the actual conditions that allow work to begin or finish.

Reference · Guide · Foundation

Find what controls the finish

The critical path is the longest duration chain through a valid dependency network under the schedule’s assumptions. It can change as durations and logic change.

Method · Guide · Applied

Milestone plan

A milestone marks a verifiable state or decision in delivery. It helps coordinate commitments without pretending to be the detailed schedule.

Model · Guide · Foundation

Critical path method (CPM)

Find the chain that sets the shortest possible duration: the work whose delay moves the end date.

Model · Study sheet · Foundation

Milestone trend analysis

Track how successive forecasts of the same milestone change over time.

Reference · Guide · Foundation

Schedule compression

Schedule compression seeks an earlier finish by changing how critical work is performed, overlapped or resourced.

Model · Guide · Foundation

Total float and free float

How long each activity can slip before the end date moves, or before the next activity must wait.

Model · Study sheet · Foundation

Calculate

Critical-path network calculator

Calculate earliest and latest dates and total float, then draw an activity-on-node (AON) diagram with critical paths highlighted.

Tool · Calculator + guide · Applied

Original sources

Critical chain and constraints

Investigate resource constraints and schedule protection through the originating author’s work.

Framework · Source pointer · Foundation